Inch by Inch I keep crawling towards the day it becomes self propelled.
Right now I am waiting on electrical parts, i.e. rectifier, voltage regulator, etc, then comes the wiring job.
 
Last edited:
Well all the wiring is done except for the Igniter and voltage regulator. Soon it will be time to check out the fuel system for proper flow and hopefully a start up and ridel.
 
OK well here it is September and I have to admit it, I took the summer off and the bikes have been collecting dust in the garage,but it is a dry dust so that should be OK.
All my attempts to get fire to the plugs had so far failed so I pulled off the electronic ignition components and replaced them with points. So now I am gearing up to go back into it with a determination that I will be riding this thing this fall. I am at the point of wiring the hot to the coils and set the timing and valves, then add fuel...Wish me luck.
 